| Assignments |
|
| Aug. 30, Sep. 1 | Design critique. Due Sept. 6 (please read before 9/1). |
| Sep. 6, 8 | Present design critiques; Look for redesign site (candidates due by 9/20); CSS lab-1 |
| Sep. 13, 15 | Positioning CSS lab-2, and screenshot; Redesign assignment; |
| Sep. 20, 22 | Submit redesign candidates |
| Sep. 27, 29 | Resume project; (CSS2.1 and CSS3 selectors, not to be handed in) |
| Oct. 4, 6 | |
| Oct. 11, 13 |
|
| Oct. 18, 20 | (Oct 18 = Break) Resumes now due |
| Oct. 25, 27 | Test #1; CSS3—Gillenwater project1 |
| Nov. 1, 3 | Gillenwater project2 (media queries) |
| Nov. 8, 10 | |
| Nov. 15, 17 | Be able to troubleshoot DHTML/jQuery files such as the style switchers or the popup messages and run a basic jQuery script, e.g. to hide an element |
| Nov. 22, 24 | Final redesign Nov. 24=Thanksgiving |
| Nov. 29, Dec. 1 | XML assignment |
| Dec. 6, 8 | PHP assignment |
| Week of Dec. 13 | Projects due 12/14, documentation due 12/15 |
| Exam: Tuesday, Dec. 13 10 a.m. |
|